Planned Activities for the Week of 1/17/2022 - 1/23/2022

10 Prospect Street (D2.1) – Future Life Sciences Building (closest to Somerville Avenue)

Gilbane Building Company

The following activities are expected to take place:

  • Form, reinforce, and place concrete foundation

  • Strip forms from concrete foundation

  • Backfill building foundation

  • Haul in soil for backfill

  • Install temporary power system and weather enclosure

Weekend Work (1/15): We may need to work the weekend stripping forms and back filling due to weather delays.

Note: Concrete trucks, dump trucks, and excavator are being used through out the week. We are planning to work Monday 1/17/2022.

20-50 Prospect Street (D2.2-D2.3) – Future Apartment Building (closest to MBTA Station)

Cranshaw Construction

The following activities are expected to take place:

  • Eversource is tentatively scheduled to energize temporary power at Lot 5

  • Concrete placements at the mid-rise podium deck

  • Masonry at the mid-rise elevator shaft

  • D2.4 stormwater storage system install

  • MBTA elevator, bike shelter & temporary trailer work

  • Steel erection and precast plank install at the tower

  • Steel erection and deck detailing at the mid-rise

Weekend Work (1/15): The plumber will be setting deck sleeves at the mid-rise podium deck.

Note: Stormwater trap system installation & backfilling work will continue at the D2.4 site, adjacent to the Allen Street gate, Monday - Friday.

Should you have any questions, please reach out to us at info@discoverUSQ.com.

Thank you,

US2
Gilbane Building Company
Cranshaw Construction

Previous
Previous

Planned Activities for the Week of 1/24/2022 - 1/30/2022

Next
Next

Planned Activities for the Week of 1/10/2022 - 1/16/2022